ANALISIS KETERSEDIAAN AIR PADA DAERAH IRIGASI BLANG KARAM KECAMATAN DARUSSALAM KABUPATEN ACEH BESAR
Abstract
Blang Karam Irrigation with a total area of ± 400 Ha of rice fields have the potential to be developed which have supported such means Embung and Technical Irrigation Network. Availability of water for irrigation needs adequately met today with a reliable flow of 1.25 m3 / s and the need for retrieval of 2,312 liters / sec / ha on alternative cropping pattern with preparing land for 30 days and the need for making 0925 m3 / sec and 1,766 ltr / s / ha on alternative cropping pattern with preparing land for 45 days and the need for making 0707 m3 / sec. This suggests that the availability of water for Blang Karam irrigation area enough to meet the needs of the growing season irrigation water for 2 times a year.
Full Text:
PDFReferences
Anonim 1, 2014, Laporan Akhir DED Daerah Irigasi Blang Karam, PT. Hidroteknik Andalan, Banda Aceh
Soemarto,CD. 1999. Hidrologi Teknik. Jakarta : Penerbit Erlangga
Sholeh M. 1998. Hidrologi I. Diktat Kuliah. Surabaya : FTSP –ITS
Sosrodarsono S, dan Tominaga M, 1984. Perbaikan dan Pengaturan Sungai. Jakarta : PT Pertja
USACE. 2000. Hydrologic Modelling System HEC HMS Technical Reference Manual. Maret 2000.
DOI: https://doi.org/10.30601/jtsu.v1i1.4
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 Jurnal Teknik Sipil Unaya
Jurnal Teknik Sipil Unaya
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
© Jurnal Teknik Sipil Unaya : Published by Center for Research and Community Service (LPPM) University of Abulyatama, Aceh, Indonesia. 2019